Package 1 - Raichur - Gadwal

Progress Status – Apr’23

Rolling for the sub Grade top layer at Km. 214+700
Rolling for the sub Grade top layer at Km. 214+700
Watering for the sub Grade top layer at Km. 214+700
Rolling for the sub Grade top layer at Km. 214+700
sub grade top layer in progress at Km. 205+000 to Km. 205+100
sub grade top layer in progress at Km. 205+000 to Km. 205+100
Grading of GSB top layer in progress at Km. 204+500
Grading of GSB top layer in progress at Km. 204+500
Dozing for the Embankment layer at 238+200
Dozing for the Embankment layer at 238+200
CH:230-000 Box culvert Concrete for slab has been completed
CH:230-000 Box culvert Concrete for slab has been completed
CH: 231+250 Reinforcement work is in progress
CH: 231+250 Reinforcement work is in progress