Tunnel IE Monthly site inspection for the month of Apr’25DBM 1st Layer Laying & Rolling Continue at Ch. 249.830 to 250.110 LhsTunnel IE Monthly site inspection for the month of Apr’25DBM Top Layer laying in progress at Ch. 247.280 to 248.075 Lhs on 06.05.2025