Rolling for the sub Grade top layer at Km. 214+700Rolling for the sub Grade top layer at Km. 214+700sub grade top layer in progress at Km. 205+000 to Km. 205+100Grading of GSB top layer in progress at Km. 204+500Dozing for the Embankment layer at 238+200CH:230-000 Box culvert Concrete for slab has been completedCH: 231+250 Reinforcement work is in progress