Package 1 - Raichur - Gadwal

Progress Status – May’25

DBM Core cutting going on along with IE TL, RE and SQME during monthly visit
DBM Core cutting going on along with IE TL, RE and SQME during monthly visit at Km. 209+110 to 210+380
Ch. 222+650 to 222+999 RHS WMM Top Layer FDD Testing during TL monthly inspection
Ch. 222+650 to 222+999 RHS WMM Top Layer FDD Testing during TL monthly inspection
219+420 To 219+600 Sub Grade Top In Progress
219+420 To 219+600 Sub Grade Top In Progress
Heavy rain fall at219, 220,221
Heavy rain fall at219, 220,221
Heavy rain fall ch 203 to 216
Heavy rain fall ch 203 to 216
Bhs Rewall Work In Progress 220+180 To 220+280
Bhs Rewall Work In Progress 220+180 To 220+280
Friction Slab Pcc Bed Preparation
Friction Slab Pcc Bed Preparation