Package 1 - Raichur - Gadwal

Progress Status – Jan’25

Pile load test along with IE team at Ch 225+794 (MNB)
205 GSB top layer rolling in progress
209+700 RHS friction slabs erection in progress

DRM Members Site Vist
Ch 225+794 Pile load