Package 1 - Raichur - Gadwal

Progress Status – Mar’25

IE Site vist and Core Cuting at Ch 205+900
209 FSCB PCC
209+840 LHS FSCB
214.720 DBM TOP
222+300 to 222+650 RHS. WMM top layer RHS.
240+980 RHS GSB TOP LAYER ROLLING WORK IN PROGRESS SIR.
Managaer (T) Site Vist along with TL and his team